Boiler tube processing

Boiler tubes rarely arrive on site in mill lengths. We supply them ready to install – cut to length, bevelled, bent and marked, exactly as your drawing specifies.

Cut & bevelledTo drawingWith certificate
Ø 17.2 – 273 mm
Tube size
± 1 mm
usual length tolerance
30° / 37.5°
common bevel angles
3.1 / 3.2
Certificate to EN 10204
Definition

What does boiler tube processing cover?

Boiler tube processing covers every step that turns a tube in mill length into a part ready to install: cutting to size, weld preparation by bevelling, cold bending to radius, swaging or expanding the ends, drilling and marking. What matters is that tolerances, bevel angle and residual wall match the drawing and the applicable code – otherwise the tube does not fit on site or the weld is not accepted.

Execution

Scope of supply & execution

Scope of supply & execution
ItemDetail
BasisParts list, drawing or isometric with lengths and bevel angles
Cutting to lengthto fixed length, usual tolerance ± 1 mm, tighter on request
Weld preparationbevelling to EN ISO 9692, 30° or 37.5°, with root face as specified
Bendingcold-bent from 1.5 × D, residual wall verified against specification
End workingswaging, expanding, upsetting or calibrating to drawing
MaterialsP235GH, P265GH, 16Mo3, 13CrMo4-5, 10CrMo9-10, X20, P91, heat-resisting
Markingitem number, heat and material, durable and traceable
Testingdimensional and visual inspection, wall thickness measurement, endoscopy on request
Documentation3.1 or 3.2 certificate to EN 10204, parts and dimension list
Materials

Materials we supply for this

The grade follows from medium, temperature and pressure. Each grade has a data sheet with composition, properties and standards.

Application

Typical fields of use

  • Tube sets for boiler outages with a tight shutdown window
  • Membrane walls and tube banks in new build
  • Economiser and superheater packages as a kit
  • Replacement tubes after a tube failure, marked by item number
  • Tube sets for heat recovery boilers and waste incineration
  • Pre-assembled units for erection under time pressure
Testing & documentation

The records you receive

Inspection certificate 3.1 or 3.2 to EN 10204

Batch-related test results for every pressure-bearing item, countersigned on request.

Non-destructive testing

Visual, penetrant, magnetic particle, ultrasonic or radiographic testing of the welds as specified.

Pressure test

Hydrostatic test to the applicable code and drawing, with test report.

Traceability

Batch and heat number of every item remain traceable through the documentation.

Process

From drawing to delivery

1. Drawing or sketch

Send us the drawing, isometric or bill of material – a hand sketch with dimensions is enough to start.

2. Agree material and code

We settle grade, standard, pressure rating and the required certificate with you.

3. Quotation

You receive a quotation with price, execution and a firm delivery date.

4. Delivery with documentation

The component arrives ready to install, with certificates and test reports.

FAQ

Boiler tube processing – frequently asked questions

Which bevel angle is the right one?

The welding procedure decides, not habit. In boiler work 30° and 37.5° are usual, each with a defined root face. Give us the WPS or the bevel angle from the drawing and we supply to match.

How accurately can tubes be cut?

± 1 mm to fixed length is usual. Tighter tolerances are possible but must be stated in the order – they cost time and cannot be produced afterwards.

Are tubes marked by item number?

Yes, on request with the item number from your parts list, in addition to heat and material. That saves sorting on site and keeps the link to the certificate traceable.

Is traceability kept after cutting?

Yes. The heat marking is transferred before cutting and reapplied to every section. Each piece therefore stays linked to its certificate to EN 10204.

What do you need for a quotation?

Parts list or drawing with lengths, tube size and wall thickness, material grade, bevel angle or WPS, the marking you want and the required certificate to EN 10204.

Boiler tube processing – request a quote

Drawing, material and quantity are enough – we come back with price and lead time.