Home
Materials & standard parts
Components to drawing
Project supply
Industries
Service & planningCalculatorAbout usBlog ContactRequest a project

Boiler spare parts

Spare parts for steam, hot-water and heat recovery boilers – to the original drawing, to a sample or to an on-site survey. We supply tubes, bends, nozzles, header parts and wear parts to fit your shutdown: on schedule, marked by position and with material certificates. ROHRLINE, based in Grafenwörth (Lower Austria), supplies Boiler spare parts to drawing – tested, with 3.1 or 3.2 certificates to EN 10204 – worldwide.

Drawing · sample · surveyOutage & shutdownMaterial certificate
drawing · sample
Basis
to your shutdown
Scheduling
P235GH – P91
Materials
3.1 / 3.2
Certificate to EN 10204
Execution

Scope of supply & execution

Scope of supply & execution
ItemDetail
PartsGenerating tubes, superheater and economiser tubes, pipe bends, nozzles, header parts, membrane wall sections, wear protection shields
BasisOriginal drawing, sample or on-site survey; missing details are clarified in writing beforehand
MaterialsP235GH, P265GH, 16Mo3, 13CrMo4-5, 10CrMo9-10, P91 – to drawing or material certificate of the original
ProcessingCutting to length, weld preparation, bending, marking by position
SchedulingAligned with the shutdown, part deliveries in erection sequence
TestingDimensional check, NDT and pressure test as specified
Documentation3.1 or 3.2 certificate to EN 10204, dimensional and test reports
Materials

Materials we supply for this

The grade follows from medium, temperature and pressure. The list below is a selection, not a limitation – we supply the grade that design and specification call for. Each grade has a data sheet with composition, properties and standards.

Application

Typical fields of use

  • Planned outage and shutdown
  • Damage case with short-notice replacement demand
  • Worn heating surfaces in waste incineration and biomass
  • Supply for older boilers without support from the original manufacturer
  • Stocking of critical spare parts
Testing & documentation

The records you receive

Inspection certificate 3.1 or 3.2 to EN 10204

Batch-related test results for every pressure-bearing item, countersigned on request.

Non-destructive testing

Visual, penetrant, magnetic particle, ultrasonic or radiographic testing of the welds as specified.

Pressure test

Hydrostatic test to the applicable code and drawing, with test report.

Traceability

Batch and heat number of every item remain traceable through the documentation.

Process

From drawing to delivery

1. Drawing or sketch

Send us the drawing, isometric or bill of material – a hand sketch with dimensions is enough to start.

2. Agree material and code

We settle grade, standard, pressure rating and the required certificate with you.

3. Quotation

You receive a quotation with price, execution and a firm delivery date.

4. Delivery with documentation

The component arrives ready to install, with certificates and test reports.

FAQ

Boiler spare parts – frequently asked questions

Can you supply spare parts without a drawing?

Yes, to a sample or a survey. We record dimensions, material and position and agree any missing details with you in writing before ordering. The material is decisive: if it is not documented, we clarify it in advance, because a wrong material in the boiler costs more than any delay.

How fast can you deliver in a damage case?

That depends on material and scope. Tubes in common boiler grades are often available at short notice; special grades and bent assemblies take longer. Tell us your shutdown date – before ordering, we will give you a binding answer on what can be done by then.

Do you supply spare parts for boilers from other manufacturers?

Yes. What counts is the drawing, sample or survey and the material certificate, not the manufacturer of the boiler. The parts are marked according to their position in the boiler, so that erection during the shutdown needs no sorting.

What do you need for a quotation?

Drawing, sample or photos with dimensions, material, quantity, shutdown date and the required certificate to EN 10204. Photos with dimensions are enough for a first calculation.

Enquiry

Send your drawing – we will clarify the rest together

A drawing, bill of materials or short description is enough to get started. If already available, the following details help us prepare your quotation quickly.

  • Drawing, sample or photos with dimensions
  • Boiler type, year of construction and position in the boiler
  • Material as per drawing or material certificate of the original
  • Quantity and shutdown date
  • Certificate 3.1 or 3.2 and delivery address

Boiler spare parts – request a quote

Drawing, material and quantity are enough – we come back with price and lead time.